Friday 6 September 2013

Day Eight

The Floor joists were fitted today.  During which we lost use of the old loft hatch and ladder so it will be difficult getting pictures for a while.

The day started off well but around 11am it started lashing down.  Our Joiner is die hard though, he stuck it out cutting the joists to size etc outside.  He then got a couple of more guys around to lift the wood into the loft.  A bit of banging, cutting and drilling and the job was done.




The climb up the ladder wasn't very enjoyable but it was worth it for the view.

Nothing much will be happening over the weekend apart from picking a new sink and toilet for the new bathroom. 
 
The dent in the biscuit barrel wasn't too bad today either.

Have a great weekend.