Friday 20 September 2013

Day Twenty Two

The end of another week.  Lots more completed and no issues to report.

Pretty much all of the insulation is in.  There are just the gable end walls and the partition walls for the bathroom to complete.

The gable end where the stairs are going may be an issue.  If it has to be insulated then it won't be flush with the existing wall below.  Hopefully the Building Inspector will agree to let us just put boards straight onto the wall.  He'll be around next week so won't be long before we know what we can/cannot do.  (The plans don't actually show insulation on the gable end walls so I think we'll be ok.)

I could tell from the guys this week that fitting the insulation (kingspan type stuff) is not the best part of the job.  It looked like it had been snowing up in the loft as every piece had to be cut and the bits get everywhere.


Lot's more going on next week.  There may be some plasterboards going up and the stairs are arriving next Friday.

Have a great weekend.